J & B Civil Infrastructure

About Us

J & B Civil Infrastructure Pty Ltd is a Sydney based company that started in early 2020 with the backing of 2 companies, D Houghton plumbing which was established in 1981 and still operating along with Cope connections established in 2017, performing high voltage and low voltage cable work to jointing. The extensive knowledge and commitment J & B infrastructure have in this niche market will ensure all projects are dealt with at the highest level, always maintaining a strong client relationship and a critical level of thinking and workmanship across all projects. It would be our great pleasure to price all level 1, sewer, water and stormwater works at tender and in the construction phase to assist winning all future projects.

Capabilities:

  • Sewer, Water and storm water construction including mains and culverts
  • High and Low voltage Asset relocations
  • Sub-division Works
  • New private pillars
  • New sub stations
  • Cable joints up to 33kv
  • Traffic control and permits
  • All safety and company management systems in place to get the job done on time, every time and safely every time.

Recent Jobs:

  • Upgrade of new stormwater system for 619 Princess highway, Tempe crossing all 6 lanes of the princess highway to install a new 450mm stormwater.
  • Upgrade of new 6” water main across Kiora rd. for new dental hospital
  • Upgrade of new 6” water main Across New South Head Rd Edgecliff for new block of units
  • Limondale Solar farm High and Low voltage DC Infrastructure works
  • Barden Ridge New Subdivision on new Illawarra RD
  • Marsden Park Zone sub both stormwater culverts and first feeder High Voltage Straight Through joints.
  • Ausgrid 1500KVA Pad mount substation Commissioning for Top Place Construction in botany
  • New 750 KVA pad mount substation at Holsworthy Army barracks for St Hilliers
  • New 750KVA pad mount substation for Urban developments in Penrith
  • New Raypak Boiler for NSW Health at St George Hospital
  • New direct Distributor for the general Gordon hotel Sydenham
  • New 375mm RCP class 4 stormwater upgrade of 180m with 6 kerb lintels for north Sydney council

Equipment

  • We have excavators ranging from 3 tonnes to 23 tonne capability’s
  • We have trucks from 3 tonnes to truck and dogs and anything in between.
  • All the right cable hauling equipment to make the job quick and reliable.

Directors information

Brock Cope

Brock specializes in high voltage cable jointing and electrical works, with over 10+ Years experience in the industry. Brock takes great pride with his cable jointing jobs and can complete any cable jointing works needed from small low voltage feeders to large high voltage asset relocations and new main HV feeders.

Jack Houghton

Jack is the plumbing, sewer, stormwater and civil guru with over 10+ years experience running jobs with crews of 2 to 15 people. Jack takes all civil jobs on whether it being a small plumbing cap off or 500mm stormwater mains install.